Friday, May 25, 2007

Floor boxes (data and electrical connections) are being installed. We will have over 20 computers for the public to use, plus separate units that will access only the online catalog. In addition, free wireless (80211.b,g) Internet access (with access to electrical outlets) will be available for anyone with their own laptop or PDA device to use at tables. Some of our lounge type seating is equipped with tablet arms.



The exterior work continues. This week, asphalt work continued. Next week the columns should be formed around the covered walkway supports.


Larry with our staff inspects the parking lot and notes the storm clouds approaching in the distance. The electrical work to complete the lighting should occur after Memorial Day.

Labels: , , ,

0 Comments:

Post a Comment

<< Home